
Home › Projects › Miami Shores, Florida
Police · Facilities
Miami Shores Police Facility Study
CPS determined current and future police space needs for the Village of Miami Shores and evaluated an adjacent property for renovation, removal, or combination into a single site for a new police facility.
The engagement
What we did
The Village of Miami Shores is landlocked, with open space at a premium and the police department located in an older two-story facility originally built as retail and office space. The Center for Public Safety was retained to undertake a space needs study determining the department’s current and future space requirements. Adjacent to the police department stood a two-story facility owned by Catholic Charities, which the charity intended to vacate in order to consolidate its services at another location. Recognizing the opportunity this created in a community with very limited developable land, CPS extended the study to examine that adjacent facility for renovation or removal, and to evaluate the possibility of constructing a new police facility on the two sites combined. The engagement gave the Village a clear picture of both its program requirements and the realistic development options available within its constrained footprint.
Related work
Other engagements

Lee County, Mississippi
Lee County E911 Facility Assessment
CPS produced a spatial needs assessment and room-by-room space allocation for Lee County’s future E911 facility, including probable development costs and grant information across a twenty-year planning horizon.
View project
Billings, Montana
Billings 911 & Emergency Management Study
CPS worked with Architects Design Group on a space needs study consolidating the City of Billings’ 911 and Emergency Management Office into one facility, evaluating multiple sites and recommending a preferred location.
View project
Terre Haute, Indiana
Terre Haute Police Facility Study
CPS conducted a space needs study for a new Terre Haute police facility and evaluated candidate sites around the city, addressing a department operating from three joined downtown buildings.
View projectStart the conversation
Tell us what your agency is facing.
Whether you are preparing a budget request, responding to a growth pressure, or standing at the beginning of a facility project, a short conversation is usually enough to tell you whether a study is the right next step, and what it would involve.